Thursday, March 10, 2011

Day 5: We're Old Pros!



Wednesday March 9, 2011

I woke up this morning and went to brush my teeth only to realize that there was no water running from the tap. This wasn’t a large concern until I thought about the end of the day and how desperately we all longed for a cold shower. Thankfully the water was back on shortly before we left for the day.

Having readied the footing for concrete, we still had to finish tying some of the rebar together. When we arrived this morning Emma, Mary and I made a bee-line for the wire cutters and got down to business. Working alongside Oscar, Juan and Antonio, tying wire was Emma’s favorite job and she is now a pro.

A lot of this morning’s work was intricate and time consuming, with the exception of mixing and pouring concrete. We were consumed with this activity starting just before lunch till the end of the day. First we combined in a pile, 8 wheelbarrows worth of course sand and 6 of gravel. After we spread that around, we added 4 bags of cement. We mixed it all up and then divided it into two piles, which we join back into one afterward. We then created a cradle in the middle into which we poured 8 buckets of water. A lot of mixing ensued.

Chris made a pun to rival any of Mr. Jollymore’s when he said of mixing and pouring concrete, “this is a solid workout”.

We finished work for the day and headed back to the hostel. We hit the showers as per usual only to find that the water pump had once again crapped out on us. Mr. Carpenter and I feared that we may have a mutiny on our hands but the kids rallied and endured their filth for another 20 minutes until (quasi-miraculously) the pump rumbled back to life.

We're all having an early night tonight -I think exhaustion, both from the heat and the work, is finally setting in. We'll work our last full day tomorrow before moving on to the resort on Friday afternoon!

I also wanted to give a big shout out to Mr. Carpenter who has been an enormous contributor to this blog and deserves half the credit for it's realization. Thanks dude!


Day 5: More Photos From Yesterday!

Yesterday was a hugely productive day, here's the proof...Start at the bottom again!


Looking at the days photos.

More mixing.

Discussing serious matters, i'm sure.

Shooting the breeze by the water cooler.


Ronald (our translator), Mr. Carpenter and Daren.
Colouring with the kids.
Pouring concrete.
MVP.
Take 2.
Mixing concrete.
Loren and Taylor Cooper.

Still more sifting.
Happiest working away at their favourite jobs.

Theresa and Taylor sifting.


Mr. Carpenter, Mary, Emma, and I.

They say it'll wash off but we're unconvinced.

Jane managing the dust!

More tying...
Tying rebar.

An "artistic" shot, as Mr. Carpenter likes to call them.

Day 4: Photos

Start from the bottom...mix of 2 days ago (Tuesday) and yesterday (Wednesday)!

Edith and her daughter Fatima.

At the river.

Finished Habitat house down the road. This is what ours will look like!

Neighbourhood kids who wanted their photo taken.

Chris (in the middle) is one of the two kids moving into the house once it's finished.

Break time...

First stages of mixing concrete.

The ladies showing off their muscles.

Every job needs a supervisor.

Standing around looking pretty?!

Tying wire.

Favorite part of the day: bus ride to our site :)

Hands taped and ready for another day in the dirt!

Wednesday, March 9, 2011

Day 4 =Day 2 On the House

Tuesday March 8, 2011

Today began much the same as yesterday. Up at 6, breakfast and bus trip to the site and straight to work.

We were hoping to finish the footing so that we could pour concrete tomorrow and we accomplished our goal! We finished digging trenches, which was a chore since we were all under the impression that we'd left that arduous task behind forever. We then had to fill them in, part way, with fine sand and tamp it down with home made compactors (consisting of big sticks in small buckets of concrete). Emma and Mary (with the help of Loren and Daren) spent the day tying wire onto metal poles, creating rebar to place in the footing.

No longer strangers to the work, we did our best to maintain a good rhythm and share tools and jobs alike to stay fresh and motivated. At one point in the afternoon there was a significant, though unscheduled break, when the majority of the team was unoccupied. This small hiccup was due to the fact that the blocks of concrete we were expecting did not arrive and we could not move forward on any other aspect of construction. It was disappointing but I think the kids enjoyed the leisure time.

We were also lucky because at lunch we were treated to a tour of the neighbourhood and a chance to see a completed Habitat house. Edith, the woman who lives next door to the house we're building, was our tour guide. She has been very good to us and is a wonderful host! As we walked she introduced us to neighbours and we attempted to communicate through words often lost of each other and a whole lot of gestures. She also brought us down to a small river by the house which was a great escape from the sun and heat.

Today was much hotter than yesterday and we were all feeling more than a little wilted by the end of our work day. Cold showers and clean clothes have never been so appreciated!

Also my mother's birthday is today so I wanted to say a special feliz cumpleanos to her from El Salvador, and let all the mothers of our group know that your kids are thinking of you everyday.

My apologies for the lack of photos today, but it's dinner time and they take forever to upload. Double the amount tomorrow I promise!

Tuesday, March 8, 2011

Day 4: A Picture is Worth How Many Words?

Just a teaser...more to come soon. Day 2 on the build and we're still going strong, although at this point even our blisters have blisters :) We're just that hardcore!

Loren showing off her mad skills.

Seeking shade.
A cashew tree.

Our forgotten "After" shot.

This is what building a house looks like!

Day 3: Building a House 101

Monday March 7, 2011 (Yesterday!)

We woke up bright and early (like that’s out of the ordinary), in time for breakfast at 6:30. Rice and beans, as we’re finding out, can be featured at any meal of the day in El Salvador including breakfast. Mr. Carpenter, Tory and I had several cups of deliciously high octane El Salvadoran coffee.

Ready to go at 7:30, we loaded the bus that would take us to our building site and drove the 20 minutes through Zacatecoluca. In the midst of what seemed like a pretty vast neighbourhood, was our plot of land. The family living next door was very kind to us and brought us food and fresh fruit throughout the day, they even sheltered us during the brief storm that rolled in late this afternoon.

Ronald, our translator, set us up with instructions and tools and we began to work along side the masons and other labourers, after putting on copious amounts of sunscreen. Within 5 minutes we were all filthy, within 7 we were drenched in sweat, and within 20 we were all exhausted. The reason? Groups arrive at projects at various stages of completion –we were the first to break ground on ours! The only thing that had been done was the marking of the foundation. All day we dug trenches with pick-axes and shovels, moved piles of dirt and rock around, bent metal and wire and set-up rebar, in preparation for the mixing and pouring of concrete for the house’s foundation.


Our daily work schedule is as follows:

6:30 Breakfast

7:30 Leave for build site

8-10:15 Work, sweat, drink agua, apply sunscreen

10:15-10:45 Break (fresh pineapple + more agua)

10:45-12 Toil under the increasingly hot sun, apply sunscreen

12-1 Lunch (rice, cheese, noodles and veggies)

1-2:30 More work, sweat, agua, sunscreen

2:30-3 Break (mango and mystery fruit sorbet!)

3-4 Final push of the day, don’t forget the sunscreen!

4-4:20 Drive back to hostel

6:30 Dinner

Out in the sun, heat stroke and dehydration are a serious concern. We were lucky to have plenty of shade and enough helping hands to rest when we needed to. There were a few head and stomach aches but with some more water and Jean’s fully stocked first aid kit, everyone rallied to finish off a solid first day. We made incredible progress, finishing the outer trenches and all but one portion of the centre wall trenches.


At first we interacted very little with the Spanish speaking masons, kids and families milling around. By the end of the day everyone had learned to say new things in Spanish and had made friends with curious by-standers. Tory, Theresa, Loren and Taylor spent some quality time with Eduardo and his sister while Emma and I traded language lessons with Oscar and Juan over rebar. We also received a translated introduction to the education system in El Salvador by Diana, the 16-year-old girl who will be living in the house, and her two friends Fatima and Janiera.




The highlight of the day was definitely the fruit sorbet we had during our afternoon break and was a welcome escape from the heat. We were also fortunate enough benefit from a cool breeze that came up sometime after lunch. With the rare and little rain we had, the dust disappeared temporarily and work was much less dirty for a while.

By time we got back on the bus, blistered and sore, we were filled with an awesome sense of accomplishment. Will and I talked about how rewarding it is already to know that no matter who finishes the house, we’ve planted it’s roots and we’ll see them take hold as we sacrifice sweat and sunscreen for the sake of our work.

We were in such a rush to hit the showers and the internet café that we forgot to take our “after” shot of the group. You’ve all seen the “before” picture, but words cannot describe the amount of dirt caked onto our bodies once we finished for the day. We’ll do our best to capture it tomorrow. Until then…Adiós amigos!


Monday, March 7, 2011

Day 3: Building Photos

I'm a day behind, I know! I'm posting pictures now and words tomorrow. Stay tuned!


On our way to build.

On the bus.

The wildlife.

In action.

MVP.

Proof!

Nothing like teamwork.

A well deserved break in the shade.

More wildlife.

Pretending to take photos for Mr. Gwathmey.

End of the building day 1.